Bidirectional charging · Store and share electricity
Charge for less. Export for more.
Put spare battery
charge to work.
The proposed PPEV equipment would let you charge when prices are low and export when conditions are right. After reserving the charge you need to drive, you could use the remaining energy to earn revenue.
See how a day could workThe operator calculates and deducts relevant costs before distributing proceeds under the contract. The diagram illustrates the proposed process.
How electricity prices affect the calculation
Where do the proceeds come from?
Charging at a lower price and exporting at a higher price creates a margin on electricity. Costs must be deducted before any proceeds can be distributed.
Equipment, service, taxes and battery wear costs are deducted before distributions under the contract. The customer’s share and payment schedule are still to be agreed. The €1.71 is an energy margin before those deductions.
* Purchase costs account for energy loss at 90% round-trip efficiency. The fixed example stays the same as you change the time and reserve charge below.
Try a different scenario
Choose a time and adjust the reserve charge to update the calculation below. The fixed example above stays the same.
Purchase and sale prices are shown separately. At 07:00 driving takes priority and the price is for reference only. To create a margin, the sale price must cover the purchase cost and energy lost in the process.
20%–80% · Assumes 80% charge and a 60 kWh battery.
The example price may make export viable
Only energy above the travel reserve is available. Actual export depends on power limits, costs and grid connection conditions.
- Energy available to export
- 10.0 kWh
- Energy margin only
- €1.71
The estimate is before equipment, service, taxes and battery wear costs.
View the assumptions and formula
Assumes a low purchase price of €0.08/kWh, an evening export price of €0.26/kWh, 90% round-trip efficiency and a limit of 10 kWh per export. The conservative export limit is min(10, (80% − reserve percentage) × 60 × 90%).
Energy margin = exported energy × export price − exported energy ÷ 90% × purchase price. Exporting 10 kWh in this example gives a margin of about €1.71. Actual prices, power and connection time affect the result.
02:00 illustrates when to charge. At 07:00 driving takes priority. At 12:00 the margin is too low. At 18:00 exporting charge above the reserve may make sense. The chart illustrates the calculation using hypothetical prices.
Where the energy goes
One charger, two ways to use spare energy.
Your electric car
Keep enough charge for your journeyBidirectional charger
Charge other vehicles
The diagram shows the proposed setup. The vehicle and equipment must be compatible, and exporting to the grid requires a connection check. Vehicle-to-vehicle pricing would be agreed separately from the grid export example.
V2L powers appliances, and V2H powers a home. V2G and V2V support must be checked separately. Backup power for a home during an outage requires dedicated equipment and safe wiring.
From concept to participation
Start with the shared requirements,
then check how you’ll supply power.
Check compatibility for each vehicle, charger and site. V2G and V2V capabilities for the vehicles shown are subject to these checks.
Vehicle and battery terms allow it
Check the specific model, market version, software, warranty and vehicle usage terms.
The equipment and site are compatible
Confirm compatibility and complete installation, connection and safety checks for the proposed setup.
The driver consents and costs are agreed
Agree on departure time, minimum charge, electricity reimbursement, battery wear and how proceeds are shared.
Check grid connection and electricity trading requirements
Check local connection permission, metering, your electricity contract and the energy provider’s participation rules.
Check both cars and how they connect
Both vehicles and the PPEV equipment need to be compatible. Connection, safety and billing arrangements are agreed separately from grid export terms.
What you may want to know
What would this mean for drivers?
Could it affect my driving the next day?
The proposed service would agree on your departure time and minimum charge before scheduling charging or exporting. Keeping enough charge to drive comes first.
Can charging and exporting wear out the battery faster?
The impact depends on battery chemistry, temperature, depth of charge and discharge, and how the system is controlled. Extra cycles, warranty coverage and wear costs need to be checked.
Who receives energy proceeds from a subscription vehicle?
The driver, asset owner, PPEV and energy provider need to agree on this. If the driver pays for charging, particularly, the parties should agree on reimbursement and distribution in advance.
Can I connect through PPEV now?
PPEV’s V2G service is still in planning. Service terms will be published once vehicle, equipment, site and partnership requirements are confirmed.
This retailer’s guide explains the concept. Compatibility and potential proceeds need a separate assessment.
Explore more